Instytut Techniki Budowlanej
Data stock: published datasets [ Download ]

Process data set overview page

Data set: Cement CEM II/A-LL 42,5 R – NA produced in Cemex Poland (00.03.000)

Full name
Cement CEM II/A-LL 42,5 R – NA produced in Cemex Poland
Location
Reference year
2023
Valid until
2028
Reference flow(s)
Type
EPD
Parameterized?
no
LCIA results included?
yes
Category
Synonyms
Use advice for data set
The EPD covers the product stage (“Cradle-to-Gate”). The selected system boundaries comprise the production of cement including raw materials’ extraction up to the finished product at the factory gate. The selected system boundaries are in accordance with the system boundaries given in EN 16908 (Figure 2).
Data set use approval
General comment
The values determined to calculate A3 originate from verified Cemex Poland LCI inventory data. A1 values (raw materials) were prepared considering specific national EPDs, Ecoinvent data and economic allocation (for a steel and energy products – gypsum, slag and ash). The allocation rules used for this EPD are based on general ITB PCR A. Production of Cement CEM II/ALL 42,5 R – NA is a line process in an manufacturing plant located at Rudniki. CEM II/A-LL 42,5 R – NA is not the only CEM product and the allocation in the manufacturing plant was made on the mass basis allocation. For a synthetic gypsum, allocated impacts are economic based but plain gypsum wase (a value = 0) are neglected in the cement LCA due to its very low impact. Minimum 99.5% of impacts from the production lines were allocated to product covered by this declaration. Energy supply was inventoried and allocated to the product assessed on the mass basis. 99.5% of the consumed materials and 100% energy consumption was inventoried in factory and were included in calculation. In the assessment, all significant parameters from gathered production data are considered, i.e. all raw material used per formulation, utilized energy, and electric power consumption, direct production waste, and available emission measurements. The following processes were excluded from the LCA study: the use of chromate reducing agents (total mass < 0.2% of cements), use of grinding balls. The total of neglected input flows per module A1-A3 does not exceed the permitted maximum of 1% of energy usage and mass. Tires consumption for transport was not taken into account. Pre components, dyes, foils, papers, labels, tapes with a percentage share of less than 0.1% were not included in the calculations. It is assumed that the total sum of omitted processes does not exceed 1% of all impact categories. In accordance with EN 15804 machines and facilities (capital goods) required for and during production are excluded, as is transportation of employees.
LCI Method Principle
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
  • Independent external review by
License and access conditions
Copyright
yes
License type
Free of charge for all users and uses
Access information
None
Owner of data set
CEMEX Polska Sp. z o.o.
Technical purpose
Cement is a hydraulic binder, which means, a finely ground inorganic material which, when mixed with water, forms a mass, which sets and hardens as a result of the reactions and hydration processes, maintaining strength and durability even under water after hardening. The cement according to the EN 197-1 standard is called CEM cement, properly measured and mixed with the aggregate and water, it should form concrete or mortar that retains workability for a sufficiently long time, and after a specified time should obtain a certain level of strength, and should maintain long-term stability of the volume. The CEM cements are made of different materials, but are statistically homogeneous in composition by quality assurance in the production and material handling processes. One of the main components of the cement is the Portland clinker. For its production, calcareous materials (for example, limestone, chalk) and other natural or waste materials are used, correcting the proportion of the silicates and aluminates, such as: clay, sand, fly ash, iron-bearing additives or slag from the steel industry. All of these materials are crushed, homogenised and introduced into a rotary kiln where they are sintered at 1450°C. In Cemex Poland the clinker is produced in two plants (Chelm, Rudniki). The main fuels used in the clinker firing process are alternative waste-derived fuels. Year by year, the share of the alternative fuels is gradually increasing, while the use of fossil fuels is decreasing. Among alternative fuels, there is the biomass for which the carbon footprint is zero. The amount of the CO2 calculated in accordance with the European regulations for monitoring the production of the CO2 for the plant in Rudniki in connection with the production of the clinker is 711 kg of the CO2/Mg of clinker, and in Chelm 718 kg of the CO2/Mg of clinker. Cement is produced by the joint grinding of the main constituents of the cement (for example, clinker, fly ash, blast furnace slag) with minor additional constituents, setting time adjuster and other additives. Cemex Poland produces cement in three plants (Chelm, Gdynia, Rudniki). The product phase (A1-A3, see Table 3) and the following processes/modules were taken into account in the LCA analysis: • A1 – the production of raw materials: fuel extraction, raw material extraction, electricity production, alternative fuel production, • A2 – the transport: transport of raw materials; • A3 – the production of a product: production of raw meal, fuel consumption for firing, consumption of the electricity for grinding. The figure below (Figure 1) shows the cement manufacturing process from the quarry to the shipment (production phase) in a schematic way.
Input Products
No records found.
Co-Products
No records found.
Data set version
00.03.000
Time stamp (last saved)
2023-06-12T17:29:46
Data set format
Compliance systems
  • EN 15804+A2 (Overall compliance: Fully compliant)
  • ISO 14025 (Overall compliance: Fully compliant)
  • ISO 21930 (Overall compliance: Fully compliant)
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.