Go to main content [shortcut key S], by skipping site tools, language selector, navigation path and navigation menu
Go to navigation menu, by skipping site tools, language selector and navigation path
Instytut Techniki Budowlanej
Selected data stock:
PUBLIC
REFERENCE_DATA
PUBLIC
REFERENCE_DATA
Data stock: published datasets
[ Download ]
Download as ZIP file
Home
Browse Data Sets
Processes
LCIA Methods
Elementary Flows
Product Flows
Flow Properties
Unit Groups
Sources
Contacts
Search Data Sets
Search Processes
Process data set overview page
Data set: Construction gypsum, Synthetic construction gypsum and Anhydrite DOLINA NIDY (00.03.000)
A more recent version of this data set exists in the database.
Most recent version of this data set:
00.04.001
Other versions:
00.04.000
View entire data set
Download data set as XML file
Download as ZIP file
Full name
Construction gypsum, Synthetic construction gypsum and Anhydrite DOLINA NIDY
Location
Reference year
2019
Valid until
2024
Reference flow(s)
Construction gypsum, Synthetic construction gypsum and Anhydrite DOLINA NIDY - 1.0 * 1.0 (Mass)
Type
EPD
Parameterized?
no
LCIA results included?
yes
Category
Synonyms
Use advice for data set
Data set use approval
General comment
The values determined to calculate the LCA originate from verified Dolina Nidy inventory data. The data for the processes come from the following databases: Ecoinvent v.3.5, specific EPDs, ELCD, Ullmann’s, ITB-Data. Specific data quality analysis was a part of external ISO 14001 audit. Characterization factors are CML ver. 4.2 based on EN 15804:2013+A1 version (PN-EN 15804+A1:2014-04). The allocation rules used for this EPD are based on general ITB PCR A. Production of the gypsum binders and anhydrite is a line process in two production plants of Dolina Nidy in Leszcze and Konin (Poland). Allocation was done on product mass basis. All impacts from raw materials extraction are allocated in A1 module of the EPD (including materials and energy consumption, transportation, emissions and wastes resulting from the production of the gypsum plasters). 100% of impacts from line production of Dolina Nidy were inventoried and were allocated to the the gypsum binders and anhydrite production. Municipal waste and waste water of Leszcze and Konin factories were allocated to module A3. Energy supply was inventoried for whole production processes. Emissions in the factories were measured and were allocated to module A3. The life cycle analysis of the declared products covers “Product Stage”, A1-A3 modules (Cradle to Gate) in accordance with EN 15804+A1 and ITB PCR A. The details of systems limits are provided in product technical report. All materials and energy consumption inventoried in factories and were included in calculation. In the assessment, all significant parameters from gathered production data are considered, i.e. all material used per formulation, utiliZed thermal energy, internal fuel and electric power consumption, direct production waste, and all available emission measurements. It can be assumed that the total sum of omitted processes does not exceed 5% of all impact categories. In accordance with EN 15804+A1, machines and facilities (capital goods) required for and during production are excluded, as is transportation of employees.
LCI Method Principle
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
Independent external review by
Ph.D. Eng. Halina Prejzner
License and access conditions
Copyright
yes
License type
Free of charge for all users and uses
Owner of data set
Atlas Sp. z o.o.
Technical purpose
Dolina Nidy is a manufacturer of gypsum and anhydrite binders for further processing (dry powder products). These binders are based on two types of raw materials: natural, exploit from gypsum quarry, and FGD gypsum. FGD gypsum is a synthetic product derived from flue gas desulfurization systems at electric power plants. Both natural and FGD gypsum are inert, non-toxic materials, harmless to human life in their natural state. They have Radiation Hygiene Certificate and in 2010 have been registered in accordance with REACH Regulation (EC) No 1907/2006 (registration number 01-2119444918-26-0138). Gypsum and anhydrite binders are produced according to EN 13279-1:2008 standard.
Input Products
No records found.
Co-Products
No records found.
Data set version
00.03.000
Time stamp (last saved)
2022-04-14T15:47:48
Data set format
Other versions
00.04.001
00.04.000
Compliance systems
EN 15804 (Overall compliance: Fully compliant)
ISO 14025 (Overall compliance: Fully compliant)
ISO 21930 (Overall compliance: Fully compliant)
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.
Yes
No